Question 
Which of the following describes RFP?

Select one:
Requirements for a Project issued by the customer
Request for Project issued by vendor
Request for Proposal issued by the customer
Requirements for Proposal prepared by vendor

The correct answer is: Request for Proposal issued by the customer

Question 
The following closely resembles a software contract

Select one:
Purchase Order issued by the customer
MoU between customer and vendor
Legal document containing Terms & Conditions
Requirements document prepared by customer

The correct answer is: MoU between customer and vendor

Question 
The ownership of software developed in a typical project with T&M model rests with

Select one:
Vendor
Customer
Jointly shared between customer and vendor
Escrow agency

The correct answer is: Customer

Question 
Limited Tendering process is normally used for

Select one:
Select projects with unique technology
Maintaining confidentiality
Eliminating competition
Identifying and eliminating weak vendors

The correct answer is: Select projects with unique technology

Question 
The primary goal of agile methodology is

Select one:
Reduce documentation overhead
Produce time-to-market products/services
Develop product in close collaboration with customers
All the mentioned

The correct answer is: All the mentioned

Question 
The following is one approach for Risk Transfer in projects

Select one:
Buy insurance from third-party agencies
Distribute risk equally between customer and vendor
Customer managing risk
All the mentioned

The correct answer is: Buy insurance from third-party agencies

Question 
Function Point (FP) Method of estimation is best used when

Select one:
Actual size of the final code (SLOC) is not known
Requirements are unclear
Technology/Development Tools are not yet known
Water-Fall Model is adopted as development methodology

The correct answer is: Technology/Development Tools are not yet known

Question
SCRUM Meetings are conducted in one of the variations of

Select one:
Rapid Prototyping model
Agile Model
Incremental & Iterative Model
All the mentioned

The correct answer is: Agile Model

Question 
The key role of Program Manager is one of

Select one:
Resource Leverage across projects
Escalation point above Project Manager
Project Information Reporting to Steering Committee
Relationship Management with customer

The correct answer is: Resource Leverage across projects

Question 
The major goal of RAD model of development is

Select one:
Reduce cost of development and time
Identify erroneous requirements early in the project
Prototype development before undertaking investment
Avoid Risk Management

The correct answer is: Reduce cost of development and time

Question 
Identification of regulatory standards for development is done during

Select one:
Requirements analysis
Contract preparation
Quality Planning
All the mentioned

The correct answer is: All the mentioned

Question 
Requirements for Proposal is prepared by

Select one:
Vendor as self-assessment of its capabilities
Customer as part of investigating vendor potential
Third-party agency to assess credit-worthiness of customer
Customer during the closure of the project

The correct answer is: Customer as part of investigating vendor potential

Question
Assignment of People to  activities in projects is done during the following phase

Select one:
Activity Planning
Resource Scheduling
Skill Assessment
Project Monitoring & Control

The correct answer is: Resource Scheduling

Question 
Warranty Maintenance of product commences when

Select one:
Acceptance and Delivery of the product is completed
Integration Testing is complete
A separate Maintenance contrast is issued by the customer
Defects start surfacing in the delivered product

The correct answer is: Acceptance and Delivery of the product is completed

Question 
Going by the experience of many IT projects in India, Fixed-Price Contracts are mostly advantageous to

Select one:
Customer
Vendor
Risk Manager
Finance Manager

The correct answer is: Customer

Question 
The following tool can be used for Project Status Reporting

Select one:
GANTT chart
MS-Excel
MS-Project
All the mentioned

The correct answer is: All the mentioned

Question 
Risk Analysis is done in Sprial Model of development after

Select one:
Every iteration
Requirements phase
System Testing
All the mentioned

The correct answer is: Every iteration

Question 
Software Product Quality is primarily determined by

Select one:
No. of Defects reported
Usability
Schedule/Cost overrun
Marketability

The correct answer is: No. of Defects reported

Question 
The role of Project Steering Committee is

Select one:
a. Govern day-to-day operations of the project
b. Report project status to the CEO
c. Escalation mechanism setup by the customer
d. High-level monitoring of the project by key stakeholders

The correct answer is: High-level monitoring of the project by key stakeholders

Question 
Critical Path in a project activity network diagram indicates

Select one:
Chain of activities requiring common resources
Path of least resistance to delay
Activities whose resources cannot be scheduled late
Activities which have zero or minimum float

The correct answer is: Activities which have zero or minimum float

Question 
Contingency measures in Risk Planning are provided for

Select one:
Preventing potential risks identified early on
Reduce the probability of occurrence of risk events
Reducing the impact of risk should it occur
Minimizing the cost of risk mitigation activities

The correct answer is: Reducing the impact of risk should it occur

Question 
To shorten the duration of a project, the following can be done

Select one:
Reducing the duration of activities on critical path
Eliminating non-critical activities
Providing more resources to activities with large float
By employing critical-chain analysis

The correct answer is: Reducing the duration of activities on critical path

Question 
The following method of project monitoring is more appropriate for T&M projects

Select one:
Weekly or Monthly review
Milestone based
Decision-point based
Upon acceptance criteria

The correct answer is: Weekly or Monthly review

Question
Earned Value Analysis (EVA) helps in

Select one:
Cost-monitoring of project
Monitoring of schedule overruns
Monitoring of cumulative effort overrun
All the given options are .

The correct answer is: All the given options are .

Question 
COCOMO II is a software estimation tool based on

Select one:
Parametric method of cost estimation
Function-point analysis of size
Analogical reasoning of past projects
Euclidian distance between similar projects

The correct answer is: Parametric method of cost estimation

Question
As a software manager, when you will decide the number of people required for a software project?
Select one:
a. Before the scope is determined.
b. None of the given options.
c. Before an estimate of the development effort is made.
d. After an estimate of the development effort is made.

The correct answer is: After an estimate of the development effort is made.

Question
Which of the following is an important factor that can affect the accuracy and efficacy of estimates?
Select one:
a. Project complexity
b. Degree of structural uncertainty
c. Planning process
d. Project size

The correct answer is: Project size

Question
Which of the following is a collection of component versions that make up a system?
Select one:
a. Baseline
b. None of the mentioned
c. Version
d. Codeline

The correct answer is: Baseline

Question
Earned value analysis does not integrate:
Select one:
a. Quality
b. Risk Register
c. Time
d. Cost
The correct answer is:  Quality

Question
Identify the sub-process of process improvement
Select one:
a. Process distribution
b. De-processification
c. Process analysis
d. Process introduction

The correct answer is: Process analysis

Question
During which stage of Risk planning are risks prioritized based on probability and impact?
Select one:
a. Identify Risks
b. Perform Qualitative risk analysis
c. Plan Risk responses
d. Perform Quantitative risk analysis

The correct answer is: Perform Qualitative risk analysis

Question 
The degree to which the design specifications are followed during manufacturing is known as_______. [    ]
Select one:
a. Quality of design
b. Quality of coding
c. Quality of conformance
d. Quality of testing

The correct answer is: Quality of conformance

Question 
Risk monitoring is associated with which phase of the SDLC?
Select one:
a. Project Planning
b. Project Closure
c. Project Execution
d. Project Initiation

The correct answer is: Project Execution

Question
Which of the following is not a project constraint?
Select one:
a. Scope
b. Budget
c. Team
d. Resources

The correct answer is: Team

Question
Which of the following is incorrect activity for the configuration management?
Select one:
a. System management
b. Change management
c. Internship management
d. Version management

The correct answer is: Internship management

Question
If probability of risk is 50% and the impact is 9 what is the risk priority?
Select one:
a. 4.6
b. 4.3
c. 4.4
d. 4.5

The correct answer is: 4.5

Question
Risk management is one of the most important jobs for a
Select one:
a. Project manager
b. Production team
c. Investor
d. Client

The correct answer is: Project manager

Question
Root Cause Analysis relates to:
Select one:
a. Quality Audits
b. Process Analysis
c. Performance Measurements
d. Quality Control Measurements

The correct answer is: Process Analysis

Question
Review process works best when number of members are in between:
Select one:
a. 5-7
b. 2-3
c. 5-6
d. 4-7

The correct answer is: 5-7

Question
PPP can serve its purpose, if we eliminate projects that incur excessive
Select one:
a. B: Validity
b. A: Risk
c. Both A: & C:
d. C: Cost

The correct answer is: Both A: & C:

Question
Identify artifacts you refer while writing the test cases ?
Select one:
a. C: Test case document
b. A: Functional requirement specification
c. A: & B: only
d. B: Use Cases

The correct answer is: A: & B: only

Question
Typical selection process is i. Create a job specification ii. Obtain applicants iii. Select potential candidates from CVs. iv. Other procedures. v. Further selection, including interview vi. Create a job holder profile. The order is:
Select one:
a. i, iii, v, ii, vi, iv
b. i, ii, iii, iv, v, vi
c. i, ii, vi, iii, v, iv
d. i, vi, ii, iii, v, iv

The correct answer is i, vi, ii, iii, v, iv

Question
As per Tuckman and Jensen, five basic stages of team development are Forming, Storming, Norming, Perfroming, Adjouring. The meaning of storming is
Select one:
a. The emphasis is now on the tasks in hand
b. Conflict arise as various members of the group try to exert leadership and the group’s methods of operation are being established
c. The members of the group get to know each other
d. Conflicts are largely settled and feeling of group identity emerges

The correct answer is: Conflict arise as various members of the group try to exert leadership and the group’s methods of operation are being established

Question
You are managing a project with budget at completion (BAC) $ 80,000. The actual cost to date you have seen is $ 25,000 and earned value is $ 17,000. You calculate estimate to complete (ETC) to $ 75,000 by doing bottom-up sum of all costs. After so many calculations, what is the estimate at completion (EAC) for the project?
Select one:
a. $ 60,000
b. $ 100,000
c. $ 53,000
d. $ 57,000

The correct answer is: $ 100,000

Question
What are the 2 important factors associated with Risk?

Select one:
a. Issue & Effect
b. Cause & Effect
c. Cause & Issue
d. Effect & Probability

The correct answer is: Cause & Effect

Question
When do you think Quality Assurance/planning activities should start?

Select one:
a. should start from the beginning of the project. Correct
b. should start at the end of implementation of the project.
c. should start after the development phase of the project.
d. should start after the solutioning phase of the project.


The correct answer is: should start from the beginning of the project.

Question
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams?

Select one:
a. The difficulty of the problem to be solved
b. High frustration caused by personal, business, or technological factors that causes friction among team members
c. The rigidity of the delivery date
d. The degree of sociability required for the project


The correct answer is: The degree of sociability required for the project

Question
A highly cohesive team needs to guard against the problem of
Select one:
a. Social loafing
b. Bureaucratic bypass syndrome Incorrect
c. Groupthink
d. over communication


The correct answer is: Groupthink

Question


Question

31 comments:

  1. Please provide the Answer of the Below Question:-

    AS202 Total baseline budget for a Project was Rs 10,00,000. At the time of a review during Project execution, it was found that the Cumulative Earned Value (EV) to date was Rs 2,50,000 while the Cumulative Actual Cost (AC) to date was Rs 4,30,000. What is the estimated total cost at completion?
    Select one:
    a. Rs 5,81,395
    b. Rs 12,90,000
    c. Rs 17,20,000
    d. Rs 9,80,400

    TI120.Software Quality planning is part of
    Select one:
    a. All of the given options
    b. Software Programing
    c. Software Quality Engineering
    d. Software Quality Assurance

    JN201 Which of the following is not Software project management goal?
    Select one:
    a. Delivering the software to the customer at the agreed time
    b. Avoiding customer complaints
    c. Keeping overall costs within budget
    d. Maintaining a happy and well-functioning development team

    KBR207. Quality planning is the process of developing a quality plan for
    Select one:
    a. customers
    b. project manager
    c. team
    d. project

    KBR202. Which of the following risk is the failure of a purchased component to perform as expected?
    Select one:
    a. Business risk
    b. Product risk
    c. Project risk
    d. Programming risk

    JN204 As a software manager, when you will decide the number of people required for a software project?
    Select one:
    a. None of the given options.
    b. After an estimate of the development effort is made.
    c. Before an estimate of the development effort is made.
    d. Before the scope is determined.

    SRC208. If the budget at completion is £19,000 and CPI is 1.86 what is Estimate at Completion EAC
    Select one:
    a. £12,400
    b. £13500
    c. £13000
    d. £10,215

    JJR205. During which stage of Risk planning are risks prioritized based on probability and impact?
    Select one:
    a. Plan Risk responses
    b. Perform Qualitative risk analysis
    c. Perform Quantitative risk analysis
    d. Identify Risks

    JJR203. If the Earned Value is equal to Actual Cost, it meANSWER::
    Select one:
    a. Project is on budget and on schedule
    b. Schedule Variance Index is 1
    c. There is no cost variance
    d. There is no schedule variance

    TI102.You are the project manager of a software enhancement project, where the application needs to be migrated to the new version of the software and along with it a new module need to be added. The planned value of the software version enhancement is $100,000 and planned value for new module to be added is $ 300,000. After 5 months, you do a performance measurement analysis to see how you are doing. The analysis showed that you are not ahead of schedule and actual costs for the version enhancement and new module were $115,000 and $350,000 and up to this point version update is 100% complete and module is only 80% complete. If you calculate of CPI at this point in the project, what it would be?
    Select one:
    a. 0.73
    b. 0.67
    c. 0.84
    d. 1.5

    KBR208. Process Analysis is a function of:
    Select one:
    a. Quality Metrics
    b. Performance Analysis
    c. Quality Improvement Plan
    d. Process Improvement Plan

    ReplyDelete
  2. AS204 A highly cohesive team needs to guard against the problem of
    Select one:
    a. Groupthink
    b. over communication
    c. Social loafing
    d. Bureaucratic bypass syndrome

    ReplyDelete
  3. Please Provide the answer of the below question:-

    PK210. Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as
    Select one:
    a. Time Allocation
    b. Effort Validation
    c. Effort Distribution
    d. Defined Milestone

    KBR209. Root Cause Analysis relates to:
    Select one:
    a. Quality Control Measurements
    b. Process Analysis
    c. Performance Measurements
    d. Quality Audits

    TI116.When do you think Quality Assurance/planning activities should start?
    Select one:
    a. should start after the development phase of the project.
    b. should start at the end of implementation of the project.
    c. should start after the solutioning phase of the project.
    d. should start from the beginning of the project.

    JS205. Virtual Working refers to
    Select one:
    a. Delegating job to other employee of the same organization
    b. Work from home
    c. Working on holidays
    d. Delegating job to other organization

    JS203. As per Tuckman and Jensen, five basic stages of team development are Forming, Storming, Norming, Perfroming, Adjouring. The meaning of storming is
    Select one:
    a. The emphasis is now on the tasks in hand
    b. Conflicts are largely settled and feeling of group identity emerges
    c. Conflict arise as various members of the group try to exert leadership and the group’s methods of operation are being established
    d. The members of the group get to know each other

    TI103.An effective project manager calculates the schedule performance index to help predict when the project will be completed. A value of one indicates the project is:
    Select one:
    a. Ahead of schedule
    b. None of these
    c. On target
    d. Behind schedule

    TI104.A new project manager in your company is asked to make a report for a project where the work is performed at the budgeted rate. He asks for your help and provide these values to you BAC = $ 35,000, Earned value (EV) = $25,000, planned value (PV) = $24,000 and actual cost (AC) = $ 28,000. What is the value of Estimate At Completion (EAC) ?
    Select one:
    a. $ 38,000
    b. $ 37,000
    c. $ 36,000
    d. $ 24,000

    SRC204. What are the 2 important factors associated with Risk?
    Select one:
    a. Effect & Probability
    b. Issue & Effect
    c. Cause & Effect
    d. Cause & Issue

    PK206. Which one is not a size measure for software product?
    Select one:
    a. LOC
    b. Cyclomatic Complexit
    c. Function Count
    d. Halstead’s program length

    PK209. Which of the following is not a project factor that should be considered when planning the structure of software engineering teams?
    Select one:
    a. The rigidity of the delivery date
    b. The difficulty of the problem to be solved
    c. The degree of sociability required for the project
    d. High frustration caused by personal, business, or technological factors that causes friction among team members

    PK212. A _________ is developed using historical cost information that relates some software metric to the project cost.
    Select one:
    a. Estimation by analogy
    b. Expert judgement
    c. Parkinson’s Law
    d. Algorithmic cost modelling

    SRC203. 60 reusable software components were planned. If only 70 percent can be used, 18 components would have to be developed from scratch (in addition to other custom software that has been scheduled for development). Since the average component is 100 LOC and local data indicate that the software engineering cost for each LOC is $14.00, the overall cost (impact) to develop the components would be 18 x 100 x 14 = $25,200. Find the Risk Exposure.
    Select one:
    a. $20200
    b. $21,300
    c. $21,000
    d. $22,500

    AS203 In which stage of team formation does a feeling of camaraderie and shared responsibility solidifies within the team?
    Select one:
    a. Performing
    b. Forming
    c. Storming
    d. Norming

    ReplyDelete
    Replies
    1. src203:
      Answer: $20200

      Delete
    2. Which one is not a size measure for software product? Select one: a. Function Count b. Cyclomatic Complexit c. LOC d. Halstead’s program length

      Ans: Cyclomatic Complexit

      Delete
  4. AS206 Which is not true about ISO 9001
    Select one:
    a. ISO 9001 just provides a general framework and not a uniform Quality Management System to be mandatorily followed by a company which applies for certification
    b. The quality of software produced by ISO certified companies will always be better than that from uncertified companies
    c. ISO 9001 lays emphasis on documentation and records
    d. ISO 9000 lays stress on process approach

    ReplyDelete
  5. TI115.The mechanism lasts for the duration of the project and covers the development process is:
    Select one:
    a. Taking corrective actions when needed
    b. Gathering the requirements
    c. Monitoring all key parameters like cost, schedule, risks
    d. Providing information on the development process in terms of metrics

    ReplyDelete
  6. TI102.You are the project manager of a software enhancement project, where the application needs to be migrated to the new version of the software and along with it a new module need to be added. The planned value of the software version enhancement is $100,000 and planned value for new module to be added is $ 300,000. After 5 months, you do a performance measurement analysis to see how you are doing. The analysis showed that you are not ahead of schedule and actual costs for the version enhancement and new module were $115,000 and $350,000 and up to this point version update is 100% complete and module is only 80% complete. If you calculate of CPI at this point in the project, what it would be?
    Select one:
    a. 0.73
    b. 0.67
    c. 0.84
    d. 1.5

    ReplyDelete
  7. KBR211. Quality Management in software engineering is also known as
    Select one:
    a. SQA
    b. SQA and SQM
    c. SQM
    d. SQI

    ReplyDelete
  8. TI118.Identify artifacts you refer while writing the test cases ?
    Select one:
    a. A: Functional requirement specification
    b. B: Use Cases
    c. C: Test case document
    d. A: & B: only

    ReplyDelete
  9. TI105.Earned value analysis does not integrate:
    Select one:
    a. Time
    b. Quality
    c. Risk Register
    d. Cost

    ReplyDelete
  10. TI106.You are managing a project with budget at completion (BAC) $ 80,000. The actual cost to date you have seen is $ 25,000 and earned value is $ 17,000. You calculate estimate to complete (ETC) to $ 75,000 by doing bottom-up sum of all costs. After so many calculations, what is the estimate at completion (EAC) for the project?
    Select one:
    a. $ 100,000
    b. $ 53,000
    c. $ 57,000
    d. $ 60,000

    ReplyDelete
  11. otal baseline budget for a Project was Rs 10,00,000. At the time of a review during Project execution, it was found that the Cumulative Earned Value (EV) to date was Rs 2,50,000 while the Cumulative Actual Cost (AC) to date was Rs 4,30,000. What is the estimated total cost at completion

    ReplyDelete
  12. Could you please let me know the below questions answer:

    1) “A monthly statement feature in a banking application” the Change request value is
    Select one:
    a. Desirable
    b. Cosmetic
    c. Essential
    d. Negligible

    2) A new project manager in your company is asked to make a report for a project where the work is performed at the budgeted rate. He asks for your help and provide these values to you BAC = $ 35,000, Earned value (EV) = $25,000, planned value (PV) = $24,000 and actual cost (AC) = $ 28,000. What is the value of Estimate At Completion (EAC) ?
    Select one:
    a. $ 37,000
    b. $ 38,000
    c. $ 24,000
    d. $ 36,000

    3) Software Quality planning is part of
    Select one:
    a. Software Programing
    b. Software Quality Assurance
    c. Software Quality Engineering
    d. All of the given options

    4) Which of the following is invalid in overcoming stress through good management practice:
    Select one:
    a. Reduced role conflict
    b. Reasonable estimates of effort
    c. Good project control leading fewer unexpected crises
    d. Sustain role ambiguity to increase productivity

    5) Identify artifacts you refer while writing the test cases ?
    Select one:
    a. B: Use Cases
    b. A: & B: only
    c. A: Functional requirement specification
    d. C: Test case document

    6) If the Task is not on target but recoverable is indicted by
    Select one:
    a. Amber
    b. Yellow
    c. Green
    d. Red

    7) Why project termination review are important?
    Select one:
    a. It is beneficial to terminated projects
    b. It provides important opportunities to learn from past mistakes
    c. All of the given options
    d. It is beneficial to other teams

    8) In which stage of team formation does a feeling of camaraderie and shared responsibility solidifies within the team?
    Select one:
    a. Forming
    b. Storming
    c. Norming
    d. Performing

    9) Virtual Working refers to
    Select one:
    a. Working on holidays
    b. Work from home
    c. Delegating job to other organization
    d. Delegating job to other employee of the same organization

    10) Subcontracting is an example of
    Select one:
    a. Risk Transfer
    b. Risk reduction
    c. Risk Acceptance
    d. Risk Avoidance

    ReplyDelete
  13. 1) Typical selection process is i. Create a job specification ii. Obtain applicants iii. Select potential candidates from CVs. iv. Other procedures. v. Further selection, including interview vi. Create a job holder profile. The order is:
    Select one:
    a. i, iii, v, ii, vi, iv
    b. i, vi, ii, iii, v, iv
    c. i, ii, iii, iv, v, vi
    d. i, ii, vi, iii, v, iv

    2) Why project termination review are important?
    Select one:
    a. It is beneficial to terminated projects
    b. All of the given options
    c. It provides important opportunities to learn from past mistakes
    d. It is beneficial to other teams

    3) The mechanism lasts for the duration of the project and covers the development process is:
    Select one:
    a. Providing information on the development process in terms of metrics
    b. Gathering the requirements
    c. Taking corrective actions when needed
    d. Monitoring all key parameters like cost, schedule, risks

    4) A highly cohesive team needs to guard against the problem of
    Select one:
    a. Bureaucratic bypass syndrome
    b. Social loafing
    c. Groupthink
    d. over communication


    5) Risk Exposure is the product of
    Select one:
    a. Probability & Impact
    b. Impact & Cause
    c. Probability & Cost
    d. Cost & Impact

    ReplyDelete
  14. What is related to the overall functionality of the delivered software?
    Select one:
    a. Product-related metrics
    b. Size-related metrics
    c. Function-related metrics(ANS)
    d. Project-related metrics

    ReplyDelete
  15. Software is difficult to build because:
    Select one:
    a. Controlled changes
    b. Lack of monitoring(ANS)
    c. Lack of reusability
    d. All of the given options

    ReplyDelete
  16. AS205 Subcontracting is an example of
    Select one:
    a. Risk Avoidance
    b. Risk reduction
    c. Risk Transfer
    d. Risk Acceptance

    Typical selection process is i. Create a job specification ii. Obtain applicants iii. Select potential candidates from CVs. iv. Other procedures. v. Further selection, including interview vi. Create a job holder profile. The order is:
    Select one:
    a. i, ii, iii, iv, v, vi
    b. i, vi, ii, iii, v, iv
    c. i, iii, v, ii, vi, iv
    d. i, ii, vi, iii, v, iv

    TI115.The mechanism lasts for the duration of the project and covers the development process is:
    Select one:
    a. Taking corrective actions when needed
    b. Providing information on the development process in terms of metrics
    c. Gathering the requirements
    d. Monitoring all key parameters like cost, schedule, risks

    SRC206. “A monthly statement feature in a banking application” the Change request value is
    Select one:
    a. Desirable
    b. Negligible
    c. Essential
    d. Cosmetic

    An effective project manager calculates the schedule performance index to help predict when the project will be completed. A value of one indicates the project is:
    Select one:
    a. Behind schedule
    b. Ahead of schedule
    c. On target
    d. None of these

    AS203 In which stage of team formation does a feeling of camaraderie and shared responsibility solidifies within the team?
    Select one:
    a. Performing
    b. Norming
    c. Forming
    d. Storming

    TI116.When do you think Quality Assurance/planning activities should start?
    Select one:
    a. should start after the development phase of the project.
    b. should start from the beginning of the project.
    c. should start at the end of implementation of the project.
    d. should start after the solutioning phase of the project.

    SRC204. What are the 2 important factors associated with Risk?
    Select one:
    a. Cause & Issue
    b. Issue & Effect
    c. Effect & Probability
    d. Cause & Effect

    TI112.Why project termination review are important?
    Select one:
    a. It is beneficial to other teams
    b. All of the given options
    c. It provides important opportunities to learn from past mistakes
    d. It is beneficial to terminated projects

    ReplyDelete
  17. Answer below questions:-


    TI112.Why project termination review are important?
    Select one:
    a. It is beneficial to other teams
    b. It provides important opportunities to learn from past mistakes
    c. It is beneficial to terminated projects
    d. All of the given options

    ////////////////////////

    JN205 In Software Engineering Environment, Environmental resources incorporates with _____________.
    Select one:
    a. Hardware and Software
    b. Only Software Components
    c. None of the given options
    d. Complexity

    //////////////////////////


    JS202. Which of the following is invalid in overcoming stress through good management practice:
    Select one:
    a. Reasonable estimates of effort
    b. Reduced role conflict
    c. Good project control leading fewer unexpected crises
    d. Sustain role ambiguity to increase productivity

    ///////////////////////////////////

    JJR204. Which of the following types of Organizational Charts can be BEST used to track project costs:
    Select one:
    a. Organizational Breakdown Structure
    b. Responsibility Assignment Matrix
    c. Resource Breakdown Structure
    d. Hierarchical type Organizational Chart

    /////////////////////////////


    KBR206. Which of the following is not a project manager’s activity?
    Select one:
    a. project management
    b. project control
    c. project design
    d. project planning

    ///////////////////////////////


    KBR207. Quality planning is the process of developing a quality plan for
    Select one:
    a. project manager
    b. team
    c. customers
    d. project

    //////////////////////////////////

    JJR203. If the Earned Value is equal to Actual Cost, it meANSWER::
    Select one:
    a. Project is on budget and on schedule
    b. There is no schedule variance
    c. Schedule Variance Index is 1
    d. There is no cost variance

    /////////////////////

    TI113.Project managers are not responsible for:
    Select one:
    a. Project design
    b. Project planning
    c. Project control
    d. Project management

    //////////////////////////////

    PK208. Which of the following is not an effective software project management focus?
    Select one:
    a. process
    b. popularity
    c. people
    d. product

    /////////////////////////

    TI101.David’s project metrics says that his project has SPI of .83 and CPI of 1.3. How can David’s Project status BEST described?
    Select one:
    a. Project is behind schedule and over budget
    b. Project is ahead of schedule and over budget
    c. Project is ahead of schedule and under budget
    d. Project is behind schedule and under budget

    /////////////////////////////

    SRC204. What are the 2 important factors associated with Risk?
    Select one:
    a. Issue & Effect
    b. Cause & Issue
    c. Effect & Probability
    d. Cause & Effect

    /////////////////////

    SRC206. “A monthly statement feature in a banking application” the Change request value is
    Select one:
    a. Essential
    b. Cosmetic
    c. Negligible
    d. Desirable

    /////////////////////////////

    PK210. Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as
    Select one:
    a. Time Allocation
    b. Effort Distribution
    c. Effort Validation
    d. Defined Milestone

    /////////////////////

    AS202 Total baseline budget for a Project was Rs 10,00,000. At the time of a review during Project execution, it was found that the Cumulative Earned Value (EV) to date was Rs 2,50,000 while the Cumulative Actual Cost (AC) to date was Rs 4,30,000. What is the estimated total cost at completion?
    Select one:
    a. Rs 17,20,000
    b. Rs 9,80,400
    c. Rs 12,90,000
    d. Rs 5,81,395


    ReplyDelete
    Replies
    1. KBR206. Which of the following is not a project manager’s activity?
      Select one:
      a. project management
      b. project control
      c. project planning
      d. project design

      Answer: project design

      Delete
    2. KBR204. Which of the following is not an effective software project management focus?
      Select one:
      a. product
      b. process
      c. popularity
      d. people

      Answer : popularity

      Delete
    3. In Software Engineering Environment, Environmental resources incorporates with _____________.
      Select one:
      a. Only Software Components
      b. None of the given options
      c. Complexity
      d. Hardware and Software

      Ans: Hardware and Software

      Delete
    4. TI101.David’s project metrics says that his project has SPI of .83 and CPI of 1.3. How can David’s Project status BEST described?
      Select one:
      a. Project is ahead of schedule and over budget
      b. Project is behind schedule and over budget
      c. Project is behind schedule and under budget
      d. Project is ahead of schedule and under budget

      Ans: (c)

      Delete
  18. Which of the following is not an effective software project management focus?
    Select one:
    a. popularity
    b. product
    c. people
    d. process

    ReplyDelete
  19. KBR212. What kind of quality cost is incurred when an error is detected in a product prior to shipment?
    Select one:
    a. External Failure
    b. Appraisal
    c. Prevention
    d. Internal Failure

    Answer: Internal Failure

    ReplyDelete
  20. SRC202. Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.”? [ ]
    Select one:
    a. Technology change
    b. Requirements change
    c. Technique Change
    d. Product competition

    ReplyDelete
  21. Which of the following is invalid in overcoming stress through good management practice:
    Select one:
    a. Reduced role conflict
    b. Good project control leading fewer unexpected crises
    c. Reasonable estimates of effort
    d. Sustain role ambiguity to increase productivity
     
    answer: Sustain role ambiguity to increase productivity
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    TI112.Why project termination review are important?
    Select one:
    a. It provides important opportunities to learn from past mistakes
    b. All of the given options
    c. It is beneficial to terminated projects
    d. It is beneficial to other teams
     
    answer: It provides important opportunities to learn from past mistakes
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    AS206 Which is not true about ISO 9001
    Select one:
    a. ISO 9001 lays emphasis on documentation and records
    b. ISO 9001 just provides a general framework and not a uniform Quality Management System to be mandatorily followed by a company which applies for certification
    c. The quality of software produced by ISO certified companies will always be better than that from uncertified companies
    d. ISO 9000 lays stress on process approach
     
    answer: ISO 9001 just provides a general framework and not a uniform Quality Management System to be mandatorily followed by a company which applies for certification
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    PK209. Which of the following is not a project factor that should be considered when planning the structure of software engineering teams?
    Select one:
    a. The degree of sociability required for the project
    b. High frustration caused by personal, business, or technological factors that causes friction among team members
    c. The difficulty of the problem to be solved
    d. The rigidity of the delivery date
     
    answer: High frustration caused by personal, business, or technological factors that causes friction among team members
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    KBR208. Process Analysis is a function of:
    Select one:
    a. Process Improvement Plan
    b. Performance Analysis
    c. Quality Metrics
    d. Quality Improvement Plan
     
    answer: Process Improvement Plan
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    If the Earned Value is equal to Actual Cost, it meANSWER::
    Select one:
    a. Project is on budget and on schedule
    b. There is no cost variance
    c. Schedule Variance Index is 1
    d. There is no schedule variance
     
    answer: There is no cost variance
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.”? [     ]
    Select one:
    a. Technology change
    b. Requirements change
    c. Technique Change
    d. Product competition
     
    answer: Technology change
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    If the Task is not on target but recoverable is indicted by
    Select one:
    a. Red
    b. Yellow
    c. Amber
    d. Green
     
    answer: Amber
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    Virtual Working refers to
    Select one:
    a. Delegating job to other organization
    b. Work from home
    c. Working on holidays
    d. Delegating job to other employee of the same organization
     
    answer: Work from home

    ReplyDelete
  22. David’s project metrics says that his project has SPI of .83 and CPI of 1.3. How can David’s Project status BEST described?
    Select one:
    a. Project is behind schedule and under budget
    b. Project is ahead of schedule and over budget
    c. Project is ahead of schedule and under budget
    d. Project is behind schedule and over budget
     
    answer: Project is behind schedule and under budget
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    In Software Project Management a 66.6% risk is considered as,
    Select one:
    a. very low
    b. low
    c. high
    d. moderate
     
    answer: high
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    Quality planning is the process of developing a quality plan for
    Select one:
    a. project
    b. team
    c. customers
    d. project manager
     
    answer: project
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    A _________ is developed using historical cost information that relates some software metric to the project cost.
    Select one:
    a. Expert judgement
    b. Algorithmic cost modelling
    c. Parkinson’s Law
    d. Estimation by analogy
     
    answer: Algorithmic cost modelling
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    Quality Management in software engineering is also known as
    Select one:
    a. SQI
    b. SQM
    c. SQA and SQM
    d. SQA
     
    Answer: SQA
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    To perform earned value analysis, you first assign a planned value to each of the elements in your:
    Select one:
    a. All of the given options
    b. Project Scope Statement
    c. Work Breakdown Structure
    d. Risk Register
     
    Answer: Project Scope Statement
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    Which of the following is not a business risk?
    Select one:
    a. losing budgetary or personnel commitment
    b. building an excellent product or system that no one really wants
    c. lack of documented requirements or software scope
    d. losing the support of senior management due to a change in focus or change in people
     
    Answer: lack of documented requirements or software scope
     
    //////////////////////////////////////////////////////////////////////////////////////////////////////////////
     
    “A monthly statement feature in a banking application” the Change request value is
    Select one:
    a. Essential
    b. Cosmetic
    c. Desirable
    d. Negligible
     
    Answer: Essential

    ReplyDelete
  23. From feasibility or Cost Plan through to the final detailed bid on a single platform with Cost estimating software.

    ReplyDelete
  24. There you can download for free, see the first of these data. General Contractors in Canada

    ReplyDelete